
Before & After
(Click on pictures to view info)

From dentist office to classroom.

Tub removed and dual sink vanity added. Shower relocated and all new electric and plumbing installed.

Linen closet removed and privacy wall built with frosted glass insert. Custom built shower with bench and niche fabricated and tiled

Shower removed and relocated. 8' his & hers linen closets with pull out hampers installed. New tile floor with heating and cooling coils underneath.

Trex decking with wire railing, white PVC deck skirt, outlets added to the exterior and low voltage up lighting under the railing.

Decking secured with all hidden fasteners to give a clean finish.

Massive swing set build on the way!

Swing set built and stained! x4 slides (one in the rear), fireman's pole, x3 swings, tire swing, glider swing, monkey bar swing and working fire hydrant. Top playhouse deleted and a sunsail with toy kitchen and workbench added to the top (screwed down to prevent movement). Play house on ground level has outlets, lights and shelving. 4' wide door and enough interior space to park x3 powerwheels and has shelving for toys. Sandbox under stairs and yellow slides dug out 1' and holds 2 tons of sand!

Drinking fountain and working hose bib.

Hall Bath renovation complete!

Hall Bath renovation complete!

Hall Bath renovation complete!

Out with the builder grade, in with the new!

Out with the builder grade, in with the new!

Out with the builder grade, in with the new!

Insulation and fire code drywall added to this unfinished garage. Recessed lights were also added to nicely light everything up. Base coat of tape and compound across all seems and screw holes. The garage will now be warm (or cool depending on the the weather) and well lit year round.

Customer started the demo of what used to be the soaking tub. We then turned that area into a spacious shower.

Customer started the demo of what used to be the soaking tub. We then turned that area into a spacious shower.

Single sink and pony wall removed and replaced with a spacious double sink (mirror to be installed at a later date).

New deck built from the ground up utilizing Trex components.

New deck built from the ground up utilizing Trex decking components

Broken window sash replaced

Pressure treated decking removed and HOA approved Trex decking installed

New water heater, expansion tank and shut off valves installed.

Tub and window removed in order to make for a larger shower with a custom bench.

Another angle showing off the custom bench and added heater fan.

Steps removed and a deck was fabricated and installed using Trex decking and railings to mimic the previous "steps" footprint


Old tile and vanity ripped out. New tile and vanity installed.

A different angle

Primary Bath remodel. Shower made slightly larger and free standing tub installed in place of drop in

2nd fl hall full bath renovation.

2nd fl hallway full bath renovation

Old pressure treated deck given new life with Trex decking and railings

Small bedroom turned into master bath

Master Bedroom part 1: Full gut, ceiling raised, new windows installed, hardwood flooring, and new electric throughout

Master Bedroom part 2: Bedroom gutted, new framing for ceilings and walls. Window seat and small closets fabricated. Barn door, stone accent wall with electric fireplace and wall mounted TV

Master bath full reno. Glass shower enclosure to be installed at a later date.

Deck Renovation part 1: 20+ year wood decking removed and new Trex decking installed with new vinyl railings

Deck Renovation part 2: Deck frame wrapped in white pvc fascia.

Small landing and steps installed using Trex components. Shed built around the utility's. Both sides open as well as the roof, for easy access for any maintenance in the future.

Full bathroom gut with new tub, tiles, toilet, vanity and plumbing/exhaust and electrical fixtures installed.

1/2 bath turned into a full bath.

All new cabinets with new electrical, exterior vented exhaust hood, pull out microwave and more.

Sump pump with battery backup replaced with a new sump pump and water powered back up.

Whole house with a well plumbing upgraded. Copper plumbing replaced with PEX, Well pressure tank upgraded, softener and 5 stage filtration unit added.

Laundry/ Mudroom part 1: Flooring removed and faux wood tile installed. Walls patched and skim coated. New outlets and moulding installed

Laundry/ Mudroom part 2: Flooring removed and faux wood tile installed. Walls patched and skim coated. New outlets and moulding installed. New waste and supply plumbing installed.

Complete bathroom remodel.

Complete Kitchen gut and remodel. Part 1/3

Complete Kitchen gut and remodel. Part 2/3

Complete Kitchen gut and remodel. Part 3/3

Rotted wood fascia above front door removed and all new pvc fascia and moulding installed

New front entry door installed

Part 1: Full bathroom gut and remodel

Part 2: Full bathroom gut and remodel

Part 3: Full bathroom gut and remodel

Hardwood flooring and baseboard moulding installed

Complete full bath reno

New slightly wider steps installed off this screened in patio

Garage door weather stripping replaced

Room constructed to hid water supply utilities.

1/2 bath upgraded with a stone wall, recessed lighted mirror and open sink vanity

Original front door replaced and new steel door installed. The owner selected a primed finish door as they plan on painting it in the future.

Wood fascia removed around bay window. Rotted sheathing and ripped vapor barrier replaced. New pvc fascia installed to ensure it'll never rot again

New garage door opener installed

Hardwood and wainscoting installed.

Badly dented garage door replaced. Rotted wood fascia removed and replaced with pvc to ensure it'll never rot again.

Builder grade sliding glass door replaced

Wainscoting fabricated and installed

Full bathroom renovation

Wall removed to make the room larger, double mulled window removed and triple mulled window installed. Carpet removed and engineered hardwood flooring installed.

Frame fabricated and installed around mirror and shelves fabricated and installed below. Recessed niche with an outlet made to house a neon bar sign.

New sump pump installed. Pit drained and cleaned.

Larger well pressure tank installed to allow this house to have water pressure comparable to public water.

Pressure treated decking rotted and removed. New pressure treated decking and railings installed to meet HOA requirements.

Wood facia and sheathing rotted. All fascia was removed as well as rotted sheathing. Sheathing replaced and PVC fascia and moulings installed for a never to rot again finish. Painting done by customer.

Pressure treated decking removed and replaced with Trex decking

Builder grade bathroom remodel

Closets transformed into 1/2 bath and dog kennel, wainscoting added to walls and hardwood installed

Hallway transformation: New flooring, lighting, doors and wainscoting

Dead space under staircase transformed into dog kennel